NEW BUILDING PRODUCTION AND HIGH-RACK STORAGE IN SINDELFINGEN (BUILDING 5)

SINCE 1958

NEW BUILDING PRODUCTION AND HIGH-RACK STORAGE IN SINDELFINGEN (BUILDING 5)

New production and high-bay warehouse in Sindelfingen (Building 5).
New construction of a production facility for coating thickness measuring devices and a high-bay warehouse. Internal connection on the ground floor with the high-bay warehouse for loading raw materials. Structural design: The building consists of two structures, with the central pane acting as a separation between the different areas and as a central entrance element. Construction: reinforced concrete flat ceilings. In production, reinforced concrete supports with suspended aerated concrete elements. In the high-bay warehouse, rolled steel profiles with suspended aerated concrete elements. The horizontal is emphasized by trained pilaster strips in the aerated concrete elements.

Client: Real estate company Helmut Fischer GmbH+Co. KG