NEW BUILDING PRODUCTION AND HIGH-RACK STORAGE IN SINDELFINGEN (BUILDING 5)
SINCE 1958
![](https://roedl-architekten.de/wp-content/uploads/2023/08/RoedlLogo_Final.png)
![Süd 3](https://roedl-architekten.de/wp-content/uploads/elementor/thumbs/Sued-3-qc0kew14as8ia1rfj84w66g3gyhqhkc2cb37iexmyw.jpg)
![Süd-Osten 1](https://roedl-architekten.de/wp-content/uploads/elementor/thumbs/Sued-Osten-1-qc0kexwsogb2x9op88y5b5z0nq8gwyjj0ke6gyuumg.jpg)
![Luftaufnahme_2015_FISCHER](https://roedl-architekten.de/wp-content/uploads/elementor/thumbs/Luftaufnahme_2015_FISCHER-qc0krf7nf9e52vk2cn5tf0lclwpx4a382c89v8co08.jpg)
NEW BUILDING PRODUCTION AND HIGH-RACK STORAGE IN SINDELFINGEN (BUILDING 5)
New production and high-bay warehouse in Sindelfingen (Building 5).
New construction of a production facility for coating thickness measuring devices and a high-bay warehouse. Internal connection on the ground floor with the high-bay warehouse for loading raw materials. Structural design: The building consists of two structures, with the central pane acting as a separation between the different areas and as a central entrance element. Construction: reinforced concrete flat ceilings. In production, reinforced concrete supports with suspended aerated concrete elements. In the high-bay warehouse, rolled steel profiles with suspended aerated concrete elements. The horizontal is emphasized by trained pilaster strips in the aerated concrete elements.
Client: Real estate company Helmut Fischer GmbH+Co. KG